Tucker Tower
9910 Hibiscus
Master permit #2022082082
11/27/23
1. Life Safety inspection continued.
2. Today verified all handrails, guardrails, steps inside both stairwells.
3. Need to remove debris and clean both stairwells prior to TCO.
4. Stair 2 on the 8th floor, repair the dent at the nose of the steps.
5. Stair 2, between 6 and 5th floor, cannot have greater than a 6 inch sphere below the guardrail.
6. Stair 2, bottom landing, the end of the inner handrail needs to return to itself or on the ground. Or provide a bracket at the end of the handrail to prevent any loose clothing from getting caught up.
7. Stair 1, 7th floor, repair the dent at the nose of the steps.
8. All balcony railings for all units from the 8th floor to the 6th floor were inspected. Below are the discrepancies.
9. For the following units, need to raise the balcony guardrails to be at least 42 inches from the finished floor. Units 803,805,807,814,713,715,611,609,605,603.
10. No access to units 815 and 816. These are pending.
11. At unit 715, at the corner of the balcony, there was a gap greater than 4 inches wide. Need to correct.
12. At the ground level generator room, paint the nose of the step in yellow and provide WATCH YOUR STEP. The rise of the step is approximately 9 inches.
13. At the exterior South exit steps ground level, Add the missing handrail and paint the nose of the step in yellow. Also, will need an emergency light in this area.
14. There are several rooms on the ground level, Multi-purpose room, Leasing office, A/C closet, Fitness room and the library that have green high temperature sprinkler heads. This inspector will research to see if this is allowed for an ordinary hazard area.
|
|