Permit Number: 2022082082 |
Date:2/5/2024 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:209 - FIRE FINAL |
Status:86 - FIRE FINAL APPRVD PENDING FEES |
Tucker Tower
|
|||
Date:12/13/2023 |
Inspector:Oscar Bouza (OBB) |
Type:208 - FIRE TCO INSPECTION |
Status:47 - APPROVED FOR TEMPORARY ONLY |
TCO RECOMMENDED FOR GENERAL OCCUPANCY. |
|||
Date:12/13/2023 |
Inspector:Oscar Bouza (OBB) |
Type:208 - FIRE TCO INSPECTION |
Status:47 - APPROVED FOR TEMPORARY ONLY |
PERMIT: 2022082082
|
|||
Date:12/13/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:208 - FIRE TCO INSPECTION |
Status:47 - APPROVED FOR TEMPORARY ONLY |
TCO Recommended for 30 days.
|
|||
Date:12/13/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:208 - FIRE TCO INSPECTION |
Status:47 - APPROVED FOR TEMPORARY ONLY |
Tucker Tower
|
|||
Date:12/12/2023 |
Inspector:Oscar Bouza (OBB) |
Type:208 - FIRE TCO INSPECTION |
Status:2 - APPROVED PARTIAL |
9910 HIBISCUS STREET
|
|||
Date:12/7/2023 |
Inspector:Oscar Bouza (OBB) |
Type:208 - FIRE TCO INSPECTION |
Status:3 - REJECTED NOT TO CODE |
#2022082082
|
|||
Date:12/5/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:219 - FIRE - INSPECTION COMMENT |
Status:90 - FIRE - COMMENTS ONLY |
Tucker Tower apts.
|
|||
Date:12/4/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:208 - FIRE TCO INSPECTION |
Status:3 - REJECTED NOT TO CODE |
Comments to follow |
|||
Date:11/30/2023 |
Inspector:Oscar Bouza (OBB) |
Type:219 - FIRE - INSPECTION COMMENT |
Status:90 - FIRE - COMMENTS ONLY |
TUCKER TOWER
|
|||
Date:11/29/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:208 - FIRE TCO INSPECTION |
Status:3 - REJECTED NOT TO CODE |
Tucker Tower
|
|||
Date:11/28/2023 |
Inspector:Oscar Bouza (OBB) |
Type:219 - FIRE - INSPECTION COMMENT |
Status:90 - FIRE - COMMENTS ONLY |
2022082082
|
|||
Date:11/27/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:208 - FIRE TCO INSPECTION |
Status:3 - REJECTED NOT TO CODE |
Tucker Tower
|
|||
Date:11/21/2023 |
Inspector:Oscar Bouza (OBB) |
Type:208 - FIRE TCO INSPECTION |
Status:2 - APPROVED PARTIAL |
TUCKER TOWER
|
|||
Date:11/12/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:219 - FIRE - INSPECTION COMMENT |
Status:90 - FIRE - COMMENTS ONLY |
Tucker Tower
|
|||
Date:11/10/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:208 - FIRE TCO INSPECTION |
Status:3 - REJECTED NOT TO CODE |
Comments to follow |
|||
Date:10/13/2023 |
Inspector:Carla Crook (CCROOK) |
Type:218 - CATEGORY VERIFICATION |
Status:1 - APPROVED |
Tucker Tower
|
|||
Date:10/10/2023 |
Inspector:Suzanne Andujar (E207705) |
Type:219 - FIRE - INSPECTION COMMENT |
Status:90 - FIRE - COMMENTS ONLY |
2022082082
|
|||
Date:3/28/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:219 - FIRE - INSPECTION COMMENT |
Status:90 - FIRE - COMMENTS ONLY |
Tucker Tower Apartments
|
|||
Date:3/28/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:219 - FIRE - INSPECTION COMMENT |
Status:90 - FIRE - COMMENTS ONLY |
10. Adjust all doors to close and positively latch at exit stairs and fire rated rooms in accordance with NFPA 101: 7.2.1.8.
|
|||
Date:3/28/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:219 - FIRE - INSPECTION COMMENT |
Status:90 - FIRE - COMMENTS ONLY |
20. Need to provide handrails (on both sides) for all the steps, stairs and ramps as per NFPA 101.7.2.2.4.1
|
|||
Date:3/28/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:219 - FIRE - INSPECTION COMMENT |
Status:90 - FIRE - COMMENTS ONLY |
40. In accordance with NFPA 101.30.3.6.4 Transoms, Louvers or Transfer Grilles shall be prohibited in walls or doors of exit access Corridors.
|
|||
Date:3/28/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:219 - FIRE - INSPECTION COMMENT |
Status:90 - FIRE - COMMENTS ONLY |
60. Provide outside signage for the Generator visible from the road showing: NO SMOKING, DIESEL GAS, amount of gallons in tank and a 704 Placard. Per NFPA 1.60.1.13.2, NFPA 1.63.2.12 Bollards to protect the generator will need to be added if located near a parking area or street. Lightning Protection will also need to be provided for outside or rooftop generators. In accordance with NFPA 110.7.11.4 & NFPA 110.7.2.5
|
|||
Date:3/20/2023 |
Inspector:Jose De Alfaraz (JOSEED) |
Type:211 - PRELIMINARY |
Status:3 - REJECTED NOT TO CODE |
Tucker Tower
|
|||
Date:3/20/2023 |
Inspector:Oscar Bouza (OBB) |
Type:219 - FIRE - INSPECTION COMMENT |
Status:90 - FIRE - COMMENTS ONLY |
SRI 3/20/23 |
|||
Date:3/20/2023 |
Inspector:Oscar Bouza (OBB) |
Type:219 - FIRE - INSPECTION COMMENT |
Status:90 - FIRE - COMMENTS ONLY |
TUCKER TOWER
|
|||